A staffing plan compares the people and hours available with the work a team expects to handle. It can show where a role is under-covered, when shifts need more capacity, or how headcount may change as a project grows. Start with the planning question you need to answer, then choose one of the four editable spreadsheets below.
These are planning layouts with source examples, not approved staffing levels. Replace sample positions, hours and assumptions, and check the workbook’s calculations before making hiring or budget decisions.
Choose a staffing plan template
| Template | Use it to | File |
|---|---|---|
| Role and FTE matrix | Compare required and proposed full-time and part-time capacity by position | XLSX |
| Daily shift coverage | Sketch position coverage by hour and estimate weekly hours | XLS |
| Project resource worksheet | List roles, skill level, duration, dates and availability | XLS |
| Quarterly headcount forecast | Map departments and roles over a multi-year horizon | XLS |
Role and FTE staffing matrix
This spreadsheet has columns for position title, minimum FTE, full-time and part-time headcount and FTE, and totals. It is a useful structure for comparing proposed capacity with a target. The source is a proposal exhibit with a sample general manager and a definition of one FTE as 2,080 hours per year; remove the procurement wording and use your organization’s own standard work hours.

Download role and FTE matrix ZIP
Inside ZIP: editable Excel XLSX.
Daily shift coverage chart
The sample places an owner, manager and three staff members against hourly time slots, with hours, breaks, days and weekly totals. Adapt it for a shop, service desk or other operation that needs to see when coverage overlaps. Replace the example arrows, shift times and totals; verify the hours after editing.

Inside ZIP: editable Excel XLS with sample shifts.
Project resources and staffing worksheet
This worksheet starts with project details and then records a resource or role, skill level, duration required, available dates and availability. Its source example is an IT project and also lists non-personnel resources. Keep the project-team rows for staffing and remove or repurpose the other categories as needed. Review the workbook’s separate instructions and definitions.

Inside ZIP: editable Excel XLS.
Quarterly headcount forecast
This multi-year example puts roles in departments and projects headcount by quarter, with subtotals and an overall employee total. Use the structure to model a growing team’s hiring sequence. The displayed figures and revenue-per-employee row are example data, not a benchmark. Clear or replace them, inspect the entire workbook and confirm any formulas you retain.

Download quarterly forecast ZIP
Inside ZIP: editable Excel XLS with example figures.
How to build a staffing plan
- Choose a time horizon. Use hours or days for coverage, months for a project, or quarters for a growth forecast. Put the period and revision date on the plan.
- Estimate the work. Record expected service hours, workload, projects or demand peaks, along with where the estimates came from.
- Count usable capacity. List current roles and the hours available for the work. Keep headcount (people) separate from FTE (a measure of equivalent working capacity). State the full-time hours used in your calculation.
- Find gaps and choose actions. Compare demand with capacity by role and period. Consider redistribution, training, temporary cover or hiring, with an owner, target date and estimated cost.
- Review the plan. Update assumptions as demand, staffing or budgets change. Check that the spreadsheet totals still reflect the revised inputs.
Worked example: weekend service coverage
A small support team expects two people on duty for each eight-hour Saturday and Sunday shift. That is 2 people × 8 hours × 2 days = 32 coverage hours per weekend. If the existing team can reliably supply 16 of those hours, the planning gap is 16 hours. The manager can test a part-time schedule, cross-training or another arrangement against the budget and actual availability. This is a simple capacity example; breaks, absences, overlap and local working rules still need to be reflected in the real plan. Pair any chosen training action with a training plan.
Frequently asked questions
What is the difference between a staffing plan and a staff schedule?
A staffing plan asks how many people or hours are needed by role and when. A schedule assigns particular people to shifts or tasks. The plan can guide scheduling, but its projected positions are not a confirmed rota.
What does FTE mean in a staffing plan?
Full-time equivalent expresses hours as a share of your defined full-time work period. For example, if full-time is 40 hours per week, 20 weekly hours equal 0.5 FTE. Define the period and standard before comparing rows; a person may have more or less than one FTE depending on how the model is set up.
Can I use the sample totals as a hiring target?
No. The source files include organization-specific examples. Enter your own demand, hours, roles, costs and assumptions, then verify calculations and get the plan reviewed through your budgeting and hiring process.
How often should a staffing forecast be updated?
Set a review cadence that matches the volatility of the work. A shift coverage plan may need frequent updates; a quarterly headcount plan can be reviewed at each planning cycle and whenever major demand or budget assumptions change.